I modified the workspace area and things are working great.
Thanks,
Lyn M.
================
I installed IBM Data Studio 4.1.4 , along with Apar1 (log4j) and new version of Installation Manager (V1.9.1.6) (done first). Open DS 4.1.4 , and did the upgrade to the workspace. The issue i have is expanding one of the DB2 LUW 11.5 instance (AIX) to display 44 databases takes much longer than DS 4.1.3 , i'm talking like 4-5 minutes. Expanding a different instance to display 12 databases take much longer and is now taking 2 minutes. Expanding DB2 z/os is very fast. Anyone have any suggestions?
Running java 1.8 and Win10
Thank you,
------------------------------
Lyn Maberry
Senior Database Administrator
Georgia Farm Bureau Insurance Company
------------------------------